Home › Laws by state › Oregon

Is plug-in solar legal in Oregon?

Bill stalled (likely refiled 2027) HB 4080
  1. Introduced
  2. Passed one chamber
  3. Passed both chambers
  4. Signed
  5. In effect

The 2026 bill died at this stage; sponsors are expected to refile in 2027.

Not yet. Oregon considered a plug-in solar bill (HB 4080) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.
Max system sizeNo capsmallest tier: Tier 1 <=25 kW
Electrician / permitPermit and inspectionutility rules apply
Tell the utility?Interconnection applicationtypical fee $0
CertificationUL 1741 inverterrequired by every utility

What this means for you

✓ What you can do

  • Apply for interconnection like any small generator (Tier 1 <=25 kW), typical fee $0.
  • Use portable panels with a power station, never connected to house wiring, with no permission at all.
  • Install conventional rooftop or ground-mount solar through the standard interconnection process.

✕ Not yet / not allowed

  • Plug a grid-tied kit into an outlet without an interconnection agreement; it can breach your service terms.
  • Expect a permit or wiring exemption; none exists without a law.
  • Count on HB 4080 this year: House Climate, Energy & Environment; hearing Feb 2026; no work session; died 3/6/2026 (short session); 2027 reintroduction planned.

What the rules say

Oregon's HB 4080 failed in 2026; PGE/Pacific Power interconnection rules apply.

What happened in 2026. HB 4080: House Climate, Energy & Environment; hearing Feb 2026; no work session; died 3/6/2026 (short session); 2027 reintroduction planned.

Before you plug in: Oregon checklist

  1. The rule that applies is Oregon Public Utility Commission's interconnection process: OAR 860-039 (net metering) / OAR 860-082 (small generator).
  2. A plug-in kit falls in the smallest tier (Tier 1 <=25 kW). $0 for Tier 1 net metering (OAR 860-039-0030); <=$100 under 860-082.
  3. Permits: 2026 NEC (10/1/2026); BCD permits; homeowner wiring allowed.
  4. Only consider kits with a UL 1741-listed inverter (UL 3700 preferred); a non-listed inverter will not be approved anywhere.
  5. What exports are worth: Retail net metering <=25 kW.
  6. If approval is slow or costly, a portable panel and power station (never connected to house wiring) needs no permission.
  7. Watch HB 4080: House Climate, Energy & Environment; hearing Feb 2026; no work session; died 3/6/2026 (short session); 2027 reintroduction planned.

The rules in detail

Oregon has no statute specific to plug-in solar (the only bill so far is HB 4080). Average residential electricity price: 15.97¢ per kWh (EIA, July 2026).

    Your utility's rules in Oregon

    No utility in Oregon publishes a rule that specifically allows or bans outlet-connected generation, so the general interconnection agreement is what applies. Here is what the largest residential utilities say and require.

    UtilityResidential customersPublished position on plug-in kits
    Portland General Electric 828,857 No specific statement (no testimony located).
    PacifiCorp (Pacific Power) 547,235 No specific statement.
    Eugene Water & Electric Board 89,582 No specific statement.

    Customer counts: EIA Form 861, 2024. Positions checked October 18, 2026.

    Interconnection terms for a sub-1.2 kW system

    RegulatorOregon Public Utility Commission.
    Governing ruleOAR 860-039 (net metering) / OAR 860-082 (small generator).
    Smallest tierTier 1 <=25 kW.
    Application fee$0 for Tier 1 net metering (OAR 860-039-0030); <=$100 under 860-082.
    Electrician / permit2026 NEC (10/1/2026); BCD permits; homeowner wiring allowed.
    Export compensationRetail net metering <=25 kW.
    Electrical code2026 NEC (Oregon Electrical Specialty Code, eff. 10/1/2026).
    In practice
    • No Tier 1 fee and retail NEM already; barrier is technical requirements.
    • Short session no carry-over; 2027 long session and 2026 NEC help.

    Plug-in solar bills in Oregon, 2025–2026

    BillSponsorStatusWhat it would do
    HB 4080Rep. Maxine Dexter per tracker (unverified)House Climate, Energy & Environment; hearing Feb 2026; no work session; died 3/6/2026 (short session); 2027 reintroduction planned.<=1,200 W; limits landlord/HOA restrictions; DCBS code update; opposition from electrician and firefighter groups.

    State incentives

    • ODOE Solar + Storage Rebate (approved contractor).
    • No sales tax; RETC expired.

    Who is pushing for a law

    • City of Portland BPS (Eric Engstrom)
    • 350PDX (Cherice Bock)
    • OSSIA
    • Environment Oregon
    • Bright Saver

    Savings preview: 800 W kit in Oregon

    About 800 kWh per year at 15.97¢/kWh, assuming a south-facing balcony or patio mount with typical shading losses.

    Adjust for your setup →

    ≈ $128/year

    Frequently asked questions

    Is plug-in solar legal in Oregon?

    Not yet. Oregon considered a plug-in solar bill (HB 4080) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.

    Do I need a permit or electrician for plug-in solar in Oregon?

    Default. Check with your local building department before you plug in.

    Do I have to tell my utility in Oregon?

    Not fully settled. Proposed: no extra fees for notification

    What can an 800 W plug-in kit save in Oregon?

    Roughly 800 kWh and about $128 per year at Oregon's average residential rate of 15.97¢/kWh, assuming a typical balcony or patio mount. See the calculator for your exact setup.

    Sources

    1. kobi5.com
    2. ncel.net
    3. Bright Saver state tracker
    4. olis.oregonlegislature.gov
    5. olis.oregonlegislature.gov
    6. law.cornell.edu
    7. Mike Holt NEC adoption list
    8. EIA Form 861 (2024)

    Spotted a change in Oregon's law? Tell us and we will update this page.