Is plug-in solar legal in Illinois?

Bill stalled (likely refiled 2027) SB 3104 (HB 4371, HB 4516)
  1. Introduced
  2. Passed one chamber
  3. Passed both chambers
  4. Signed
  5. In effect

The 2026 bill died at this stage; sponsors are expected to refile in 2027.

Not yet. Illinois considered a plug-in solar bill (SB 3104 (HB 4371, HB 4516)) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.
Max system sizeNo capsmallest tier: Level 1 certified inverter <=25 kW (10 kW per some sources)
Electrician / permitPermit and inspectionutility rules apply
Tell the utility?Interconnection applicationtypical fee $50
CertificationUL 1741 inverterrequired by every utility

What this means for you

✓ What you can do

  • Apply for interconnection like any small generator (Level 1 certified inverter <=25 kW (10 kW per some sources)), typical fee $50.
  • Use portable panels with a power station, never connected to house wiring, with no permission at all.
  • Install conventional rooftop or ground-mount solar through the standard interconnection process.

✕ Not yet / not allowed

  • Plug a grid-tied kit into an outlet without an interconnection agreement; it can breach your service terms.
  • Expect a permit or wiring exemption; none exists without a law.
  • Count on SB 3104 / HB 4524 this year: Passed Senate Energy & PU Committee 3/12/2026; 3rd Reading 3/26; stalled April; re-referred to Assignments 5/22/2026; veto session or 2027.

What the rules say

Illinois' SB 3104 stalled in April 2026 over a low-wattage carve-out; the sponsor expects a revised bill in the veto session or 2027.

What happened in 2026. SB 3104 / HB 4524: Passed Senate Energy & PU Committee 3/12/2026; 3rd Reading 3/26; stalled April; re-referred to Assignments 5/22/2026; veto session or 2027.

Before you plug in: Illinois checklist

  1. The rule that applies is Illinois Commerce Commission's interconnection process: 83 Ill. Adm. Code Part 466 (small DER) / Part 467.
  2. A plug-in kit falls in the smallest tier (Level 1 certified inverter <=25 kW (10 kW per some sources)). ComEd Level 1 $50; up to 22 business days.
  3. Permits: No statewide residential NEC; Chicago Electrical Code + licensed contractors; municipal permits.
  4. Only consider kits with a UL 1741-listed inverter (UL 3700 preferred); a non-listed inverter will not be approved anywhere.
  5. What exports are worth: Post-2025 net metering credits supply only + DG rebate ($300/kW) which plug-in systems would not get.
  6. If approval is slow or costly, a portable panel and power station (never connected to house wiring) needs no permission.
  7. Watch SB 3104 / HB 4524: Passed Senate Energy & PU Committee 3/12/2026; 3rd Reading 3/26; stalled April; re-referred to Assignments 5/22/2026; veto session or 2027.

The rules in detail

Illinois has no statute specific to plug-in solar (the only bill so far is SB 3104 (HB 4371, HB 4516)). Average residential electricity price: 19.22¢ per kWh (EIA, July 2026).

  • Sponsor: Sen. Rachel Ventura (D-Joliet).
  • Utilities: Utilities and labor unions cited backfeeding; Senate Energy Cmte 9-4 Mar 12, 2026; stalled April.

Your utility's rules in Illinois

No utility in Illinois publishes a rule that specifically allows or bans outlet-connected generation, so the general interconnection agreement is what applies. Here is what the largest residential utilities say and require.

UtilityResidential customersPublished position on plug-in kits
ComEd 3,727,675 No specific statement; press refers only to generic utility/labor backfeed concerns. source
Ameren Illinois 1,060,894 Shared Ameren FAQ: 'You cannot operate your private generation system until' application approved and Certificate of Completion signed; emergency generators 'not capable of sending energy to the smart grid' need no application. source
MidAmerican (IL) 73,582 No specific statement.

Customer counts: EIA Form 861, 2024. Positions checked October 18, 2026.

Interconnection terms for a sub-1.2 kW system

RegulatorIllinois Commerce Commission.
Governing rule83 Ill. Adm. Code Part 466 (small DER) / Part 467.
Smallest tierLevel 1 certified inverter <=25 kW (10 kW per some sources).
Application feeComEd Level 1 $50; up to 22 business days.
Electrician / permitNo statewide residential NEC; Chicago Electrical Code + licensed contractors; municipal permits.
Export compensationPost-2025 net metering credits supply only + DG rebate ($300/kW) which plug-in systems would not get.
Electrical codeNone statewide residential (2008 NEC commercial outside home rule); Chicago 2017-based.
State guidance on plug-in devicesQuincy Fire Chief Steve Salrin concerns on backfeed/extension cords (Apr 2026).
In practice
  • Came closest to passage; sticking point is 392-1,200 W tier.
  • Chicago code/licensing applies regardless of state law.

Plug-in solar bills in Illinois, 2025–2026

BillSponsorStatusWhat it would do
SB 3104 / HB 4524Sen. Rachel Ventura (D-Joliet); Rep. Daniel Didech (D-Buffalo Grove); cosponsors Guzman, Faraci, Walker, Castro, Porfirio, Koehler, Edly-AllenPassed Senate Energy & PU Committee 3/12/2026; 3rd Reading 3/26; stalled April; re-referred to Assignments 5/22/2026; veto session or 2027.Plug-In Illinois Act: <=1,200 W; <392 W exempt from landlord/HOA rules; 30-day notification; no DG rebate; stuck on 392-1,200 W low-oversight tier.

State incentives

  • Illinois Shines (Approved Vendor required).
  • DG rebate requires interconnection.
  • No sales-tax exemption.

Who is pushing for a law

  • Vote Solar (Kavi Chintam, Nathan Phelps)
  • Illinois Environmental Council
  • Bright Saver

Savings preview: 800 W kit in Illinois

About 845 kWh per year at 19.22¢/kWh, assuming a south-facing balcony or patio mount with typical shading losses.

Adjust for your setup →

≈ $162/year

Frequently asked questions

Is plug-in solar legal in Illinois?

Not yet. Illinois considered a plug-in solar bill (SB 3104 (HB 4371, HB 4516)) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.

Do I need a permit or electrician for plug-in solar in Illinois?

Default. Check with your local building department before you plug in.

Do I have to tell my utility in Illinois?

Default: ComEd/Ameren interconnection applies. Plugging in a grid-tied kit without following this can breach your service agreement.

What can an 800 W plug-in kit save in Illinois?

Roughly 845 kWh and about $162 per year at Illinois's average residential rate of 19.22¢/kWh, assuming a typical balcony or patio mount. See the calculator for your exact setup.

Sources

  1. nprillinois.org
  2. PlugInSolarUS
  3. ilga.gov
  4. capitolnewsillinois.com
  5. wgem.com
  6. ilga.gov
  7. Mike Holt NEC adoption list
  8. EIA Form 861 (2024)

Spotted a change in Illinois's law? Tell us and we will update this page.