Home › Laws by state › Iowa

Is plug-in solar legal in Iowa?

Bill stalled (likely refiled 2027) HF 2046
  1. Introduced
  2. Passed one chamber
  3. Passed both chambers
  4. Signed
  5. In effect

The 2026 bill died at this stage; sponsors are expected to refile in 2027.

Not yet. Iowa considered a plug-in solar bill (HF 2046) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.
Max system sizeNo capsmallest tier: Level 1 certified inverter <=10 kW
Electrician / permitPermit and inspectionutility rules apply
Tell the utility?Interconnection applicationtypical fee $125
CertificationUL 1741 inverterrequired by every utility

What this means for you

✓ What you can do

  • Apply for interconnection like any small generator (Level 1 certified inverter <=10 kW), typical fee $125.
  • Use portable panels with a power station, never connected to house wiring, with no permission at all.
  • Install conventional rooftop or ground-mount solar through the standard interconnection process.

✕ Not yet / not allowed

  • Plug a grid-tied kit into an outlet without an interconnection agreement; it can breach your service terms.
  • Expect a permit or wiring exemption; none exists without a law.
  • Count on HF 2046 / SF 2056 this year: Introduced 1/14/2026, House Commerce; died at Feb 2026 funnel; deferred to 2027.

What the rules say

Iowa's HF 2046 did not advance in 2026; its sponsor plans to reintroduce in January 2027.

What happened in 2026. HF 2046 / SF 2056: Introduced 1/14/2026, House Commerce; died at Feb 2026 funnel; deferred to 2027.

Before you plug in: Iowa checklist

  1. The rule that applies is Iowa Utilities Commission's interconnection process: 199 IAC Chapter 45.
  2. A plug-in kit falls in the smallest tier (Level 1 certified inverter <=10 kW). Up to $125 application + $125 witness test (rule text pre-7/16/2025; verify).
  3. Permits: State electrical inspection; 2023 NEC (7/1/2025).
  4. Only consider kits with a UL 1741-listed inverter (UL 3700 preferred); a non-listed inverter will not be approved anywhere.
  5. What exports are worth: Inflow-outflow at retail until value-of-solar set (by 7/1/2027 or 5% penetration).
  6. If approval is slow or costly, a portable panel and power station (never connected to house wiring) needs no permission.
  7. Watch HF 2046 / SF 2056: Introduced 1/14/2026, House Commerce; died at Feb 2026 funnel; deferred to 2027.

The rules in detail

Iowa has no statute specific to plug-in solar (the only bill so far is HF 2046). Average residential electricity price: 15.99¢ per kWh (EIA, July 2026).

    Your utility's rules in Iowa

    No utility in Iowa publishes a rule that specifically allows or bans outlet-connected generation, so the general interconnection agreement is what applies. Here is what the largest residential utilities say and require.

    UtilityResidential customersPublished position on plug-in kits
    MidAmerican Energy 632,436 No specific statement; agreement 'grants approval to proceed'; Certificate of Completion 'gives you permission to operate'. source
    Interstate Power & Light (Alliant) 417,153 No specific statement.
    Linn County REC 30,323 No specific statement.

    Customer counts: EIA Form 861, 2024. Positions checked October 18, 2026.

    Interconnection terms for a sub-1.2 kW system

    RegulatorIowa Utilities Commission.
    Governing rule199 IAC Chapter 45.
    Smallest tierLevel 1 certified inverter <=10 kW.
    Application feeUp to $125 application + $125 witness test (rule text pre-7/16/2025; verify).
    Electrician / permitState electrical inspection; 2023 NEC (7/1/2025).
    Export compensationInflow-outflow at retail until value-of-solar set (by 7/1/2027 or 5% penetration).
    Electrical code2023 NEC (eff. 7/1/2025).
    In practice
    • Sales-tax exemption plausibly applies to kit at purchase.
    • MidAmerican requires witness test and Certificate of Completion as PTO.

    Plug-in solar bills in Iowa, 2025–2026

    BillSponsorStatusWhat it would do
    HF 2046 / SF 2056Rep. Sean Bagniewski (D-Des Moines)Introduced 1/14/2026, House Commerce; died at Feb 2026 funnel; deferred to 2027.<=1,200 W 120 V outlet; no approval/fees; IEC warns utilities 'could require customers to unplug' unapproved units.

    State incentives

    • Sales-tax exemption Iowa Code 423.3(90) for panels/inverters (plausibly covers kit components).
    • State solar credit expired.

    Who is pushing for a law

    • Iowa Environmental Council
    • Bright Saver

    Savings preview: 800 W kit in Iowa

    About 864 kWh per year at 15.99¢/kWh, assuming a south-facing balcony or patio mount with typical shading losses.

    Adjust for your setup →

    ≈ $138/year

    Frequently asked questions

    Is plug-in solar legal in Iowa?

    Not yet. Iowa considered a plug-in solar bill (HF 2046) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.

    Do I need a permit or electrician for plug-in solar in Iowa?

    Default. Check with your local building department before you plug in.

    Do I have to tell my utility in Iowa?

    Default. Plugging in a grid-tied kit without following this can breach your service agreement.

    What can an 800 W plug-in kit save in Iowa?

    Roughly 864 kWh and about $138 per year at Iowa's average residential rate of 15.99¢/kWh, assuming a typical balcony or patio mount. See the calculator for your exact setup.

    Sources

    1. axios.com
    2. Bright Saver state tracker
    3. iuc.iowa.gov
    4. tax.iowa.gov
    5. Mike Holt NEC adoption list
    6. EIA Form 861 (2024)

    Spotted a change in Iowa's law? Tell us and we will update this page.