Is plug-in solar legal in Georgia?

Bill stalled (likely refiled 2027) HB 1304
  1. Introduced
  2. Passed one chamber
  3. Passed both chambers
  4. Signed
  5. In effect

The 2026 bill died at this stage; sponsors are expected to refile in 2027.

Not yet. Georgia considered a plug-in solar bill (HB 1304) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.
Max system sizeNo capsmallest tier: Residential <=10 kW AC
Electrician / permitPermit and inspectionutility rules apply
Tell the utility?Interconnection applicationtypical fee $100
CertificationUL 1741 inverterrequired by every utility

What this means for you

✓ What you can do

  • Apply for interconnection like any small generator (Residential <=10 kW AC), typical fee $100.
  • Use portable panels with a power station, never connected to house wiring, with no permission at all.
  • Install conventional rooftop or ground-mount solar through the standard interconnection process.

✕ Not yet / not allowed

  • Plug a grid-tied kit into an outlet without an interconnection agreement; it can breach your service terms.
  • Expect a permit or wiring exemption; none exists without a law.
  • Count on HB 1304 this year: Held without vote by House Energy, Utilities & Telecommunications (Chair Don Parsons) 2/25/2026; dead; deferred to 2027.

What the rules say

Georgia's HB 1304 was held in committee after utility co-ops objected; Georgia Power/EMC interconnection rules apply.

What happened in 2026. HB 1304: Held without vote by House Energy, Utilities & Telecommunications (Chair Don Parsons) 2/25/2026; dead; deferred to 2027.

Before you plug in: Georgia checklist

  1. The rule that applies is Georgia Public Service Commission (Georgia Power); EMCs/munis self-regulate's interconnection process: Georgia Cogeneration and Distributed Generation Act (2001); Georgia Power RNR tariff.
  2. A plug-in kit falls in the smallest tier (Residential <=10 kW AC). Georgia Power $100 interconnection fee (billed after completion); Carroll EMC $100.
  3. Permits: Permit + witness test; 2023 NEC.
  4. Only consider kits with a UL 1741-listed inverter (UL 3700 preferred); a non-listed inverter will not be approved anywhere.
  5. What exports are worth: RNR Instantaneous Netting ~7.2 c/kWh (2026); monthly-netting pilot full.
  6. If approval is slow or costly, a portable panel and power station (never connected to house wiring) needs no permission.
  7. Watch HB 1304: Held without vote by House Energy, Utilities & Telecommunications (Chair Don Parsons) 2/25/2026; dead; deferred to 2027.

The rules in detail

Georgia has no statute specific to plug-in solar (the only bill so far is HB 1304). Average residential electricity price: 16.27¢ per kWh (EIA, July 2026).

  • Utilities: Georgia EMC lobbyist cited lineworker safety; chair declined vote.

Your utility's rules in Georgia

No utility in Georgia publishes a rule that specifically allows or bans outlet-connected generation, so the general interconnection agreement is what applies. Here is what the largest residential utilities say and require.

UtilityResidential customersPublished position on plug-in kits
Georgia Power 2,452,488 Opposed HB 1304: 'The notion of a blanket exemption for small systems is not something that I think is prudent' (Wilson Mallard); 'Georgia Power believes this legislation is not needed' (Joshua Peacock). source
Georgia EMCs (Jackson, Cobb, Sawnee, GreyStone, Walton) 892,702 Georgia EMC opposed HB 1304: 'The safety of our linemen ... is a reason that we oppose House Bill 1304' (Emily Pateuk). source

Customer counts: EIA Form 861, 2024. Positions checked October 18, 2026.

Interconnection terms for a sub-1.2 kW system

RegulatorGeorgia Public Service Commission (Georgia Power); EMCs/munis self-regulate.
Governing ruleGeorgia Cogeneration and Distributed Generation Act (2001); Georgia Power RNR tariff.
Smallest tierResidential <=10 kW AC.
Application feeGeorgia Power $100 interconnection fee (billed after completion); Carroll EMC $100.
Electrician / permitPermit + witness test; 2023 NEC.
Export compensationRNR Instantaneous Netting ~7.2 c/kWh (2026); monthly-netting pilot full.
Electrical code2023 NEC (eff. 1/1/2025).
In practice
  • Clearest on-record utility opposition in scope.
  • $100 fee billed after completion; ~7.2 c export credit.

Plug-in solar bills in Georgia, 2025–2026

BillSponsorStatusWhat it would do
HB 1304Rep. Imani Barnes (D-Tucker), bipartisan cosponsorsHeld without vote by House Energy, Utilities & Telecommunications (Chair Don Parsons) 2/25/2026; dead; deferred to 2027.Georgia Residential Solar Access Act; <=1,200 W; utility opposition on lineworker safety.

State incentives

  • No state credit; sales-tax status unclear.

Who is pushing for a law

  • Environment Georgia
  • Southern Alliance for Clean Energy
  • Georgia Solar Energy Association
  • Bright Saver

Savings preview: 800 W kit in Georgia

About 896 kWh per year at 16.27¢/kWh, assuming a south-facing balcony or patio mount with typical shading losses.

Adjust for your setup →

≈ $146/year

Frequently asked questions

Is plug-in solar legal in Georgia?

Not yet. Georgia considered a plug-in solar bill (HB 1304) that did not pass in 2026; a new version is expected. Until then, utility interconnection rules apply.

Do I need a permit or electrician for plug-in solar in Georgia?

Default. Check with your local building department before you plug in.

Do I have to tell my utility in Georgia?

Default rules apply. Plugging in a grid-tied kit without following this can breach your service agreement.

What can an 800 W plug-in kit save in Georgia?

Roughly 896 kWh and about $146 per year at Georgia's average residential rate of 16.27¢/kWh, assuming a typical balcony or patio mount. See the calculator for your exact setup.

Sources

  1. npr.org
  2. Bright Saver state tracker
  3. environmentamerica.org
  4. georgiapower.com
  5. Mike Holt NEC adoption list
  6. EIA Form 861 (2024)

Spotted a change in Georgia's law? Tell us and we will update this page.